Tag Archive for Commercial fit-up

Restroom Addition

A utility company in Durham needed additional restroom accommodations to keep warehouse personnel, truck drivers, and muddy footed field crews from tracking through the office. We found an area in the warehouse where the waste water line could be accessed and built this new restroom. Fully ADA accessible and separated from the nice office carpet…

Below are some pictures of the finished product

commercial7-bath-2

 

commercial7-bath-1

 

commercial7-bath-3

A.J. Shirely

Anthony & Company Construction, Inc.

Box 280 Rolesville NC 27571

919-570-9446 office

919-882-1472 fax

919-669-8826 mobile

 

AnthCo.com

 

 

Drive Through CPA?

Drive Through CPA?

That’s right! Rodney Seagraves CPA in Raleigh was quickly converted to a drive through when a client accidentally drove through the glass façade of building.

Below is a picture of the intruding car

photo 8

The driver accidentally hit the gas instead of the brake, crashed through the wall, destroyed the front desk crashed through the next office wall…

Below are a few pictures of the destruction

photo 7

photo 3

photo 6

Fortunately this happened on a Saturday and the office was closed and no one was injured in the accident. Once the office was cleaned up it was secured temporarily with plywood.

photo 16

The City of Raleigh posted an unsafe building certificate and had PGE pull the electrical meter, which closed the CPA for business at the beginning of the week.

We quickly went jumped into action at the opening of business Monday morning, working closely with the Fire Marshall and the City of Raleigh to get the power restored. Some interior electrical and wall repairs and the City granted temporary power, allowing the CPA to open and use the undamaged offices.

Over the next few weeks the building was restored and is now better than ever with brand new glass façade, new laminate flooring and a fresh coat of paint.

Below are some pictures of the finished project

photo 10b

 

photo 12

 


photo 14photo 13

Read more

Granville Pallet Company

We recently did this renovation on the main offices at the Granville Pallet Company in Oxford

 

These first three pictures are before we began

 

This is a picture of the reception office before we began – outdated carpet pic 1 granvilleand wall paper…

 

 

 

 

 

 

This is a picture of the conference room before wepic 2 granville began

 

 

 

 

 

 

 

This is a picture of the back office before we beganpic 3 granville

 

 

 

 

 

 

 

This is a picture of the bath before we beganpic 4 granville

 

 

 

 

 

 

 

 

 

It wasn’t possible for the office to close for a renovation, so to accommodate this we started on a Friday afternoon and worked some very long hours through the weekend to get the front reception area completed in time for business as usual by Monday morning. We then continued the long hours through the next few days and completed this project in less than 1 weeks time!

 

We gave the entire place several coats of paint,

replaced the door separating the Reception area

from the Conference room,

installed a glass panel at a cased opening                           pic 5

and installed new Pergo laminate on all the floors. The picture to the right is of the Reception area when we were completed.

 

 

Below is another view of the completed Reception area

 

pic 6

 

 

 

 

 

 

 

 

 

Here’s a view of the completed Conference room

 

pic 7 granville

 

Here is a picture of the completed back office and bath

 

pic 8 granville

pic 9 granville

Visit Us On TwitterVisit Us On FacebookVisit Us On Linkedin